4,000-tonne topside module for a high-voltage HVDC direct current substation. The project was built at the Puerto Real shipyard and once in operation has led to a reduction in CO2 emissions.
Cliente
Cliente
Parque
4,000-tonne topside module for a high-voltage HVDC direct current substation. The project was built at the Puerto Real shipyard and once in operation has led to a reduction in CO2 emissions.

Alcance
Fecha